Adams Hendry – Projects

haylingsolarfarm

Solar Farm, Hayling Island

By | January 20, 2015

Solar Farm, Hayling Island Planning to secure long-term energy security through renewables Adams Hendry prepared an application for consent for a solar panel installation at Manor Farm on Hayling Island. The installation is required to improve energy self-sufficiency at the farm, providing 70% of its energy requirements through renewable sources, and reducing the carbon footprint [...] Continue Reading
crossness1

Enhanced Digestion: Beckton, Crossness, Oxford and Riverside STWs

By | September 19, 2014

Enhanced Digestion: Beckton, Crossness, Oxford and Riverside STWs Planning for the provision of innovation in the handling of sewage sludge Since 2010 Adams Hendry have been working with Thames Water and its contractors to deliver Enhanced Sludge Digestion Facilities at its Beckton, Crossness, Oxford and Riverside Sewage Treatment Works. These facilities utilise Thermal Hydrolysis to [...] Continue Reading
gas1

Cross Solent Gas Pipeline

By | September 19, 2014

Cross Solent Gas Pipeline Successfully managing overlapping legislative and consent regimes Adams Hendry prepared an application for consent to the Secretary of State for Energy and Climate Change for the installation of new high-pressure twin gas pipelines under the Solent connecting the mainland in New Forest District and the Isle of Wight. Consent was sought [...] Continue Reading
oikos2

Oikos Storage, Essex

By | September 19, 2014

Oikos Storage, Essex Helping to deliver nationally significant infrastructure Adams Hendry has been acting on behalf of Oikos Storage Ltd, the operators of the nationally significant fuel storage terminal located on Canvey Island, since 2008. Over this period we have provided a variety of planning services including strategic planning advice, achieved both planning permission and [...] Continue Reading
selby2

Selby Wind Farms

By | September 15, 2014

Selby Wind Farms Providing development management assistance to Local Authorities Adams Hendry assisted Selby District Council with the determination of a number of major wind farm applications in 2011 that had been submitted concurrently: an application for 14 no. 125m high wind turbines at Wood Lane, Birkin; 7 no. 125m high wind turbines at Bishopwood, [...] Continue Reading