Multi Award Winning Town Planners & Environmental Consultants
 
 
services
graphics Forums
   
     Renewable Energy back next
                                 

Contact:
Emma Barnett
Adams Hendry Consulting Ltd
7 St Peter Street
Winchester
SO23 8BW

01962 877414
e.barnett@adamshendry.co.uk

          
 

Concerns about climate change give a new emphasis to the need to reduce emissions by the inclusion of measures to generate energy by renewable means in development proposals. The London Plan (2008), for example, requires developers to make sure carbon emissions will be cut by 20% through the development of on-site renewable energy. Adams Hendry is experienced in the submission of planning applications for the production of electricity by means of wind turbines and the burning of biogas and solid wastes.

Adams Hendry has secured planning permission for an Anaerobic Digestion process that will treat 10-25% of sludge generated at Beckton STW in East London together with a new wind turbine.

 

The wind turbine will be rated at 1.5MW, with a height to hub of 65m, blade diameter of 60m, and total height of 95m. It is located just 13.5 km (8.5 miles) from Trafalgar Square.

Our skills include:
• Stakeholder consultation
• Advice on delivering the policy requirements for    renewable energy;
• Advice on the siting of wind turbines;
• Environmental Impact Assessment
• Planning Agent


Projects:

Adams Hendry Consulting Ltd. 7 St Peter Street, Winchester SO23 8BW   01962 877414